Hebron Drilling Drains Project

Categories
Hebron Drilling Drains Project

Allswater provided design and engineering services for fabrication of a Drilling Drains Treatment Package for the Hebron Project. The package – consisting of four distinct skid sets (six skids total) – included, Feed Pump skids, a Decanter Centrifuge skid, Disc Stack Decanter skids and a Treated Water Holding Tank skid. Using in-house personnel, Allswater completed all structural, piping and mechanical tasks and provided PEGNL stamps for all design critical drawings and documentation. We also provided subcontracted electrical and instrumentation design services, and assisted with procurement, and installation.