Integrated Engineering and Construction Supervision for the Mobilization of the Horizon Enabler

The Horizon Enabler was retrofitted with a motion-compensated Walk-to-Work (W2W) system, Temporary Living Quarters (TLQ), and supporting infrastructure to enable safe offshore personnel transfers. The work was completed under a tight timeline, coordinated across fabrication sites in Canada, Spain, and the United States.

The Horizon Enabler required major upgrades to support live-aboard operations and safe personnel transfers to and from offshore installations. Key requirements included: 

  • Installation of TLQ units with full amenities for extended offshore living 
  • A motion-compensated Walk-to-Work gangway system 
  • Integration of electrical, mechanical, safety, and structural systems 
  • Class and Flag approvals for all modifications 
  • Rapid turnaround across multiple fabrication sites 

The greatest challenge was completing all design, fabrication, and approvals within a short construction window to meet the charter schedule. 

Allswater provided full-service engineering, construction supervision, and certification support to ensure timely completion and compliance. 

Design & Engineering 

  • Structural and mechanical engineering 
  • Electrical system integration and updates 
  • Updated General Arrangement, Life Saving, and Fire Control Plans 
  • Sea fastening design for TLQ units and additional heavy equipment 
  • Stability analysis and crane operations review 
  • Piping schematics and “as-fitted” documentation 
  • Updated docking and tonnage calculations 

Construction & Site Support 

  • On-site verification of TLQ beam locations and sea fastenings 
  • Lidar Scanning of existing layout and structures 
  • Stability updates and weight confirmations 
  • Integrated coordination with construction and approval processes to minimize schedule impacts 

Certification Support 

  • Coordination with DNV for Class approvals 
  • Preparation of revised and “As-Built” documentation packages 

This integrated engineering and supervision approach expedited installation and fabrication, reduced risk, and ensured compliance without compromising vessel performance or structural integrity. 

  • The Horizon Enabler was outfitted with TLQ units and a W2W system within the required schedule. 
  • The motion-compensated gangway enabled safe personnel transfers in dynamic sea conditions. 
  • The integrated approach enabled the charter to begin on time. 
  • Allswater’s flexible, cross-disciplinary process reduced downtime and ensured operational readiness.