Belle Carnell Completes Successful Sea Trial After Innovative Conversion
Posted Jul 18, 2015
Posted Jul 18, 2015
Posted Jun 30, 2015
Posted Jun 15, 2015
Allswater are proud to be part of this exciting and innovative project. The first Triton platform is planned for installation at the FORCE site on the Bay of Fundy and is scheduled to begin providing tidal energy to Nova Scotia in 2017.
Posted Jun 2, 2015
Posted Apr 29, 2015
Posted Oct 1, 2014
Allswater provided design and engineering services for fabrication of a Drilling Drains Treatment Package for the Hebron Project. The package - consisting of four distinct skid sets (six skids total) - included, Feed Pump skids, a Decanter Centrifuge skid, Disc Stack Decanter skids and a Treated Water Holding Tank skid.
Posted Jun 2, 2014
Allswater is pleased to announce, Black Rock Tidal Power, owned by Schottel of Germany, TidalStream of the United Kingdom, and Nova Scotia-based companies, Akoostix Inc., Dynamic Systems Analysis Ltd, Seaforth Engineering and Allswater, were successful with their bid to design and deploy a test turbine to generate tidal electricity, at the Force site in the Bay of Fundy.
Posted Mar 28, 2014
The Green Marine Annual Conference (Greentech 2014) will be held this year in St John NB, from June 10 - 12. Allswater, as one of the sponsors of the event will be hosting the morning coffee break on June 10th.
Posted Nov 30, 2013
The vessel "Capecante" was refloated after lengthening at Astander Shipyard in Spain. ALLSWATER was contracted to develop the concept and detail design drawings for the lengthening and conversion as well as to assist in Project Management and shipyard selection.
Posted Aug 16, 2013
Allswater is pleased to announce George Brown has joined our team and brings with him over 35 years of progressive marine electrical and ship survey and inspection experience.